Decker Boston Knob and Tube(617) 405-3599Get an Estimate

Free tool

Knob and tube wiring assessment

9 questions about what you already know about the house. The result says how urgent your situation is, what it means and what to do next. Nothing is sent anywhere.

Nothing to open, test or measure. Answer from what you already know.

Answer the questions

1. What has you looking into knob and tube right now?
2. Roughly when was the house built?
3. What kind of building is it?
4. Has any rewiring been done since the house was built?
5. Does the house have fuses or circuit breakers?

Answer from what you already know, an inspection report or the listing. There is no need to open the panel.

6. Have you noticed any of these?

Choose all that apply.

7. What is the plan for insulating the attic or walls?
8. Does the house rely on extension cords or space heaters?
9. Is the house being bought or sold?

0 of 9 answered

Your result

Answer the 9 questions and your result appears here. Nothing is sent anywhere, and the questions only ask about what you already know.

How the result is decided

The rules run in a fixed order, and the first one that matches decides the result. The same answers always give the same result. The building type, the panel and any earlier rewire then add their own steps, such as planning a triple-decker floor by floor or asking a condo association which wiring is yours.

If you saidThe result
Heat, scorch marks or a burning smellStop using the affected circuit and call an electrician now. This outranks every other answer.
A pending purchase or sale, an insurer or an inspection reportHave the circuits traced before the date that matters to you.
Insulation planned, or a Mass Save assessment stopped itDeal with the knob and tube first: Mass Save insulates an area only after a licensed electrician certifies it free of active knob and tube.
Insulation already in place over unchecked wiringHave the attic wiring checked soon.
Fuses blowing often, or daily extension cords and space heatersGet the overloaded circuits checked soon.
A remodel coming upPlan the rewire with the remodel, while walls are open.
A permitted whole-house rewire already doneConfirm what is left with the permit record.
None of the abovePlan, not urgent.

What this check cannot tell you

It cannot see inside walls, so it cannot say how much knob and tube a house has, whether a run is live or dead, or what condition it is in. Only tracing the circuits answers those questions.

It does not say whether a house is safe, and it does not predict what an insurer or lender will decide. Massachusetts publishes no single insurance rule for knob and tube, and homeowners report different terms from different carriers; the result is a way to plan the conversation with them.

Where the Massachusetts rules come from

The insulation result follows Mass Save's Home Energy Assessment standards, which treat active knob and tube as a barrier to insulation, and the City of Boston's guidance that inactive knob and tube does not block it. The remodel result follows the Massachusetts Electrical Code, 527 CMR 12.00, which also keeps new wiring uncovered until the inspector of wires has seen it. In Boston, a licensed contractor files the electrical permit with Inspectional Services; homeowners can't. Next: estimate the cost for your house.

Talk through your result

Send your result and the house details. Your assessment result is added to the request.

Call (617) 405-3599
Decker Boston Knob and Tube
361 Newbury Street, 5th Floor, Boston, MA 02115
office@deckerbostonknobandtube.com
Monday to Friday, 8 AM to 6 PM; Saturday and Sunday, 9 AM to 2 PM
Outside these hours, emergency calls only

Photos of the attic, the basement ceiling and the panel help most.

Step 1 of 2

The house and the work
Call (617) 405-3599Get an Estimate